Wallingford Bridge closed

Leigh Hatts

1 min read
Share Article

Wallingford Bridge is closed following problems with a burst water main caused by the cold weather.

The bridge structure is being checked.

The Thames Path does not cross the bridge but the closure is affecting Thames Travel Buses.

See page 146.

Written by Leigh Hatts

View all posts →

Leave a Reply

Your email address will not be published. Required fields are marked *